First phase of a dynamic scenario-based mine feasibility study from exploration through operations to final mine closure plan. Includes preparation of a geological model, calculation of resources, generation of focused technical reports, community consultation and economic reports. Identify and compare conceptual mining methods for consideration in Mine Design Project II (see MIN E 403). Prepare regular team reports and presentations. Present findings during a half-day final industry seminar. Weekly seminars with instructor and industry experts. Corequisites: MIN E 413 and MIN E 414. Note: Restricted to fourth-year traditional and fifth-year co-op engineering students.
Section | Capacity | Class times | Login to view Instructor(s) and Location |
---|---|---|---|
LECTURE A1
(50493) |
30 |
2025-09-02 - 2025-12-08 (T)
13:00 - 13:50
|
|
Section | Capacity | Class times | Login to view Instructor(s) and Location |
---|---|---|---|
LAB D1
(50494) |
30 |
2025-09-02 - 2025-12-08 (MW)
14:00 - 16:50
|
|
Section | Capacity | Class times | Login to view Instructor(s) and Location |
---|---|---|---|
SEMINAR E01
(50692) |
30 |
2025-09-02 - 2025-12-08
|
|