Principles and practices of underground total air conditioning. Control of quantity, quality, and temperature-humidity of the underground mines. Design and analyses of mine ventilation networks. Theory and applications of fans to mine ventilation systems. Ventilation planning and overall system design. Prerequisites: MIN E 414 and one of CIV E 330 or CH E 312. Corequisite: MIN E 422.
| Section | Capacity | Class times | Login to view Instructor(s) and Location |
|---|---|---|---|
|
LECTURE B1
(76492) |
30 |
2027-01-04 - 2027-04-09 (TR)
08:00 - 09:20
|
|
| Section | Capacity | Class times | Login to view Instructor(s) and Location |
|---|---|---|---|
|
LAB H21
(76493) |
30 |
2027-01-04 - 2027-04-09 (T)
14:00 - 16:50
|
|