Introduction to underground pipeline infrastructure. Focus on pipeline condition assessment. New construction such as horizontal directional drilling, pilot tube microtunneling, pipe bursting, and pipe jacking. Rehabilitation methods such as cured in place pipe lining, geotechnical consideration. Risk considerations for underground projects.
Section | Capacity | Class times | Login to view Instructor(s) and Location |
---|---|---|---|
LECTURE X50
(75972) |
30 |
2025-01-06 - 2025-04-09 (W)
17:00 - 20:00
|
|