Jeff Boisvert, PhD, PEng
Fall Term 2026 (1970)
MIN E 402 - Mine Design Project I
4.5 units (fi 8)(FIRST, 1-1S-6)
First phase of a dynamic scenario-based mine feasibility study from exploration through operations to final mine closure plan. Includes preparation of a geological model, calculation of resources, generation of focused technical reports, community consultation and economic reports. Identify and compare conceptual mining methods for consideration in Mine Design Project II (see MIN E 403). Prepare regular team reports and presentations. Present findings during a half-day final industry seminar. Weekly seminars with instructor and industry experts. Corequisites: MIN E 413 and MIN E 414. Note: Restricted to fourth-year traditional and fifth-year co-op engineering students.
LECTURE A1 (50460)
2026-09-01 - 2026-12-08
T 13:00 - 13:50
LAB D1 (50461)
2026-09-01 - 2026-12-08
MW 14:00 - 16:50
SEMINAR E01 (50651)
2026-09-01 - 2026-12-08
01:00 - 01:00